Work on realizing the play «The Lake»
As part of the theater project, I was responsible for preparing the technical specifications for the suppliers of lifting equipment.

Based on the floor plan designs and in compliance with regulations for public spaces, the necessary dimensions, load capacity, lift height, and safety requirements for the equipment were determined.Using the prepared technical specifications, communication was held with suppliers, resulting in four commercial proposals from various manufacturers.A comparative analysis of the proposals—covering technical specifications, cost, manufacturing lead times, and installation terms—was conducted to select the most suitable solution, taking into account the project’s unique characteristics.




